| Weight | 0.71 kg |
|---|---|
| Dimensions | 182 × 23 × 61 cm |
Long Lead Acid Battery 12V 2.3Ah, WP-1223A
The Long WP1223A is a special-purpose maintenance free battery which is specially designed for use in medical equipment and video recording devices. The battery is maintenance free, and therefore is spill-proof and can be used in any position.
Applications: Medical Electronics, Video Recording Devices.
Stock Position: This Battery is normally stocked by us.










Reviews
There are no reviews yet.